Conditions of Use: |
Land Use |
---|---|
Usage: | Common Units |
Output Type: | AC Three Phase |
Cooling Method: |
Air Cooled |
Installation Method: |
Portable |
Generator Type: |
Load Bank |
Customization: |
---|
Suppliers with verified business licenses
With quick connections 100kw resistive Load Bank for generator UPS testing
1. Convenient and light aluminium frame 100kw load Banks for Generator UPS Testing
Portable AC Load Bank offers the most robust, high-capacity designs in the industry. Portable AC Load Bank is setting the standard with intelligent operator controls, safety indication layouts, adjustable load step resolution, and lightweight designs. Portable AC Load Bank is the perfect solution for regularly scheduled maintenance testing and commissioning of mission-critical standby emergency power systems.
2. Convenient and light aluminium frame 100kw load Banks for Generator UPS Testing
AC400-100kW Automatic Load Bank | |
Rating Voltage/Frequency | AC400V/ 50Hz/60Hz, 3 phase 4 wire, |
Rated Power | Resistive load: 100kW |
Installed Capacity | Resistive load: 100kW |
Load Step | 1,2,2,5,10,20,20,40kW, min step load: 1kW |
PF(Power Factor) | 1 |
Load Tolerance (each step) | ±5% |
Load Tolerance(overall) | ±1% |
Display Precision | 0.5 class |
Control Power | External AC110~240V/50~60Hz/1kW |
Wire Connection | Load power supply input--quick plug Control power supply input--3 pin socket |
Insulation | F |
Duty cycle | Continuous |
Transportation | Hoisting, there are lifting lugs on top of casing and wheel castors at bottom |
Casing Color | Grey(RAL7035)or as you required |
Equipment Dimension | About 540mm×292mm×604mm |
Weight | About 35kgs |
Operating Environment Parameter | |
Workplace | Indoor or outdoor |
Ambient Temperature | -20ºC~+50ºC |
Relative Humidity | ≤95% |
Altitude | ≤2500 meter |
Atmospheric Pressure | 86~106kPa |
Brands of Main Components | |
Fuse | Miro |
PLC | Siemens |
Data processing software | Kaixiang(self-developed) |
Alloy Resistance | Kaixiang(self-developed) |
3. Pictures of Customized 100kW Load Bank AC for Generator Testing
Protection
4. Why choosing us
5.Data Processing Software Functions:
Communication type: through RS485 or USB interface.
Load mode: manual load or automatic load.
Manual load: input power and power factor.
Automatic load: User can set several periods of power and time, and in turn of 0%→25%→50%→75%→100% etc or other preset order (33%→66%→99%) to make automatic load testing.
Parallel testing: when several load banks parallel working, parameters of each load bank can be displayed and recorded, so do the final parameters of paralleling working.
Real-time parameter: Current, voltage, power, power factor, frequency, time, etc could be displayed by software.
Safety monitoring: User can know the working conditions of load bank through software indicating light. When in abnormal stop protection, software will indicate the reasons of stopping.
Data collection interval: the min saving interval is 2 seconds.
Data saving and in query: testing data could be saved in software, user can query at any time.
Data display: it could display real-time data and history data; user can print voltage, current, frequency, power graphs and charts.
Suppliers with verified business licenses