• 2MW Dummy Loadbank
  • 2MW Dummy Loadbank
  • 2MW Dummy Loadbank
  • 2MW Dummy Loadbank
  • 2MW Dummy Loadbank
  • 2MW Dummy Loadbank

2MW Dummy Loadbank

Rated Power: 2000kw
Dimension: 6058 mm*2438mm*2591mm
Duty Cycle: Continuous
Cooling: Industrial Heavy Duty Blower, Horizon Air Intake,
Control Mode: Manual/Remote/Software
Resistance: Special Alloy Resistance
Customization:
Gold Member Since 2014

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
2000KW Load Bank
Use
Generator Testing
Monitoring & Display Meter
Voltage, Current, Power, Power Factor, Frequency
Transport Package
Container Structure
Specification
ISO9001: 2008
Trademark
Triumph Load
Origin
Shijiazhaung, Hebei, China
HS Code
9030390000
Production Capacity
5 Sets/Month

Product Description

Introduction
Resistive load bank is a device which can simulate the real-life resistive loads and provides a rigorous test regime for power supplies from 1kW to 60MW. The "load" of a resistive load bank is created by the conversion of electrical energy to heat by power resistors. It mainly used to test and maintenance of Engine Generators, Storage Battery Systems, UPS Systems, Inverters, Ground Power Units, Auxiliary Power Units, Aircraft Power Generators, Wind Generators, Hydro Generators etc.
Resistive load bank are available in stationary type for permanent installation or portable type with lifting rings, castors. Larger load banks, typically above 1250KW, are based on an ISO container construction. Special finishes including custom paint colors and stainless steel casings can be supplied.
 
Main features
 
1. Multiple control mode: (1) manual panel control (2) remote control (3)software control
2. Multiple display function: voltage, current, frequency, power factor, active power, reactive power, apparent power etc.  
3. Multiple protection function: overvoltage, overcurrent, overheat, over low blowing rate, blower overheat, blower phase sequence reverse protection, smoke alarm etc.
4. Forced air cooling: industrial heavy duty fan, horizon air intake, upwards outlet, low noise.
5. Power consumption components: made by special alloy resistance, high temperature resisting, high heat dissipation capability, high heat stability, no naked light, safety and reliability. Running temperature is 1/3 of rating. 
6. Weather-proof structure: containerized structure provides ultra protection, protection grade higher than IP55.
7. Material and coating: the body adopt cold-rolled steel plate that processed by galvanizing corrosion protection, powder coated and spray paint.
8. Integrated & modularization design: compact structure, easy to installation, maintenance and transportation.
9. Software control: it can test and display voltage, current, frequency, power factor, active power, reactive power, apparent power etc, the test result can be store & print and form all kinds of curve, chart and test report.

Technical Paramters of 2MW dummy loadbank 
 

Rated Load Voltage

400V, 3 phase 4 wire, 50HZ

Rated Load Power

2000KW

Power Factor

1

Min Load Step

1KW

Resistive Load Steps

1kw,2kw,2kw,5kw,10kw,10kw, 20kw,50kw,100kw,200kw,200kw, 200kw,200kw, 500kw,500kw total 15 steps

Duty Cycle

Continuous

Cooling

Forced air cooling by industrial fan, low noise

Ventilation Method

Horizontal inlet air and upwards exhaust cooling

Enclosure

Container type with a ladder, air inlet and outlet with mesh enclosure and protection door

Max Protection Grade

IP55

Ambient Temperature

-10ºC~+50ºC

Dimensions

6058 mm*2438mm*2591mm(length*wide*high)

Weight

About 4000kgs

Type for Choice

Manual Type

Control Mode

Panel

Display Instrument

voltmeter, amperemeter display single phase voltage and current

Automatic Type

Control Mode

Panel or software

The Main Application Of The Load Bank 
Factory testing of engines generator sets
To reduce "wet stacking" problems
Periodic exercising of stand-by engine generator sets
Load testing of AC power source
On-site acceptance testing
UPS system testing and maintenance
New projects inspection and battery system maintenance
Load optimization in prime power applications
2MW Dummy Loadbank 2MW Dummy Loadbank
2MW Dummy Loadbank2MW Dummy Loadbank2MW Dummy Loadbank2MW Dummy Loadbank
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now