• 11kv 3MW Mv Load Bank for Generator Test
  • 11kv 3MW Mv Load Bank for Generator Test
  • 11kv 3MW Mv Load Bank for Generator Test
  • 11kv 3MW Mv Load Bank for Generator Test
  • 11kv 3MW Mv Load Bank for Generator Test
  • 11kv 3MW Mv Load Bank for Generator Test

11kv 3MW Mv Load Bank for Generator Test

Conditions
of Use:
Trailer Type, Marine, Land Use
Usage: Standby Unit, Common Units
Output Type: AC Three Phase
Cooling
Method:
Air Cooled
Installation
Method:
Fixed
Generator
Type:
Diesel Generator
Customization:
Gold Member Since 2014

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
AC11-3000KW
Voltage
11kv
Power
4MW
PF
1
Frequency
50Hz 60Hz
Container
30FT
IP
54
Communication
RS485,RS232
Cooling
Air Cooled
Control
Local and Remote
Resistor
Metal Alloy
Transport Package
Container
Specification
ISO, CE
Trademark
Triumph Load
Origin
China
HS Code
90303900
Production Capacity
500 Units

Product Description

11KV 3000kW  Load Bank for Gas Turbine Testing:
The ability to test critical power systems at voltages of 1.2KV to 80kV using direct-connect, High Voltage Load Bank offers engineers flexibility, time savings, cost savings, space savings and simplicity. It mainly used to commission utility, oil & gas, and industrial power systems without the need for additional transformers and cabling.

11kv 3MW Mv Load Bank for Generator Test11kv 3MW Mv Load Bank for Generator Test


Application of 11KV 3500kW  Load Bank for Gas Turbine Testing:
Large generator system testing in ocean engineering, drilling facilities,ship construction etc field
Factory testing for generator, static voltage characteristic test, speed characteristic test;
Marine generator overload protection test,parallel operation test,reverse power and reverse current protection test
Assist shipyard in mooring test,sea trial test
Assist with the acceptance of the vessel generator test
Eliminate the carbon deposition of generator
As the generator loading system
Periodic running test for standby generator
UPS inspection and maintenance
Ship battery charging/discharging system testing
The acceptance of new system and testing of servicing equipment
Technical Parameter of 11KV 3000kW  Load Bank for Gas Turbine Testing

11kv 3MW Mv Load Bank for Generator Test11kv 3MW Mv Load Bank for Generator Test

 
System Parameter
Rating voltage/frequency 11KV, 3 phase 3wire 50Hz
Max Load Power  Resistive Load: 3000kW
Load Steps Total 6 steps:500kw,500kw,500kw,500kw,500kw,500kw
Power Factor 1
Load Tolerance (each step) ±5%
Load Tolerance (overall) ±3%
Fan &Control Voltage External AC 3 phase 4 line, 380V/50Hz
Wire Connection Load bank input--Copper bar (star coupling "Y")
Control power input--Connector-bar
Communication Interface RS485,RS232
Insulation F
Max Protection Grade IP54
Duty Cycle Continuous  
Cooling Forced air cooling, by Axial Fan; horizontal inlet air, vertical exhaust cooling
Enclosure Container type,with a ladder, air inlet and outlet with mesh enclosure and protection door
Internal Lighting Adequate internal lighting will be provided
Transportation Hoisting, there are lifting lug in top of casing
Color Grey RAL7035 or as required
Dimensions About 9150mm×2350mm×2591mm(L×W×H)
Operating Environment Parameter
Ambient Temperature -10ºC~+50ºC
Relative Humidity ≤95%
Atmospheric Pressure 86~106kPa

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now