3 Phase AC Rl Integrated Automatic Load Bank

Product Details
Customization: Available
Output Type: AC Three Phase
Cooling
Method:
Air Cooled
Gold Member Since 2014

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Years of Export Experience
The export experience of the supplier is more than 10 years
Self-branded
The supplier has 5 Self-brands, check the Audit Report for more information
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (24)
  • 3 Phase AC Rl Integrated Automatic Load Bank
  • 3 Phase AC Rl Integrated Automatic Load Bank
  • 3 Phase AC Rl Integrated Automatic Load Bank
  • 3 Phase AC Rl Integrated Automatic Load Bank
  • 3 Phase AC Rl Integrated Automatic Load Bank
  • 3 Phase AC Rl Integrated Automatic Load Bank
Find Similar Products

Basic Info.

Model NO.
AC200-300kW
Transport Package
Wooden Case
Specification
900mm*1250mm*1630mm
Trademark
Triumph Load
Origin
Hebei, China (Mainland)
HS Code
9030339000
Production Capacity
1500 Set/Sets Per Year

Product Description

 Three - phase AC RL Integrated Automatic Load Bank

Introduction

Thank you for using Three - phase AC RL Integrated Automatic Load Bank. The system accurately test output power and load capacity of all kinds of generators, main electrical parameters including the dynamic parameters tested.

Technical Parameters

Technical Parameters

Rating Voltage/Frequency

200VAC 3 phase 4 wire 400Hz

Max Load Power

300KW

Load Step

(200V/50Hz)

Resistive Load:8steps; 1,2,2,5,10,20,20,50,kW.

 

Power Factor

1

Load Tolerance (each step)

±5%

Load Tolerance (overall)

±3%

Display Precision

0.5 class

Control Power Supply

External power supply 220VAC 

Wire Connection

Load Power Supply Input--busbar (star connection)

Control power supply input--terminal block

Communication Interface

RS485, RS232

Insulation Class

F

Protection grade

IP54 during storage state. Power bin IP21

Working Mode

Continuous Working

Cooling

Forced air cooling

Transportation

Lifting, there are load-bearing rings on the top of the chassis and foot wheels at the bottom. Add a handle on the front and a handle on the back of the equipment to facilitate daily procrastination.

Control Panel

Control panel with transparent windows. Load bank have electric indication, fan operation instructions, etc.

Identify

All the places involved in the identify include device body, control panel, software theme bar, instruction manual, etc that change the original identify with customer identity EPD. The identify style is shown on the last page of the technical agreement.

Chassis color

Gray(RAL7035)

Dimension

Approximately 900mm×1250mm×1630mm

(Width *Length *Height)

Weight

About 600kg.

Operating Environment Parameter

Using Place

Outdoor

Ambient Temperature

-10ºC~+50ºC 

Relative Humidity

≤95%

Altitude

≤1500 meters

Atmospheric Pressure

86~106kPa

Measuring Control Function

--Load testing: Load power that not beyond the rated power, testing and display stable state 3 phases voltage, current, active power, frequency, working time, etc of generator sets.

--Load/unload with one key: Whether manual control, remote control or software control, user can preset the power, then press load master button. Load bank loaded according to preset power to avoid load fluctuation during the power changing.

--Control Pattern: user can choose local control and intelligent control.

--Local Control: There is local control panel with several power steps; user can load/unload by button.

--Intelligent Control: Through data processing software in PC, user can make automatic load, display, record and manage the testing data, form curves, tables, also print is available.

--Control Pattern interlock: There is control pattern switch, when choose one control pattern, operation of other pattern is invalid, avoid the clash.

--Local meter display data: Local meter can display 3 phases voltage, current, active power, frequency and so on.

Software Function

--Communication pattern: Intelligent control use photoelectric isolated RS485 interface connect to PC, with great anti-interference performance to make system control stable. Also user can use USB or RS232 through converter.  

--Load pattern: Manual Load or Automatic Load.

--Manual Load: Input power, system will load according to preset power.

--Automatic load: User can preset power and length of working time of several load periods, as per 0%→25%→50%→75%→100% or 110% to make testing.

--Real-time parameter: Through software to display voltage, current, power, power factor, frequency and time, etc.

--Data Collection Interval: the minimum data resolving time is 2s.

--Security monitoring and control: Monitor working state of the load bank by watching software light, when abnormally stop and protect, it can show the reason.

--Data save and query: All the test data is saved in the software, easy to query in the history testing data.

--Graphical display: Show real-time or history testing data, and support to print curve and graph as follows:

1) Graphs of real-time voltage, current, frequency and power; 2) Voltage graph

3) Current graph; 4) Power graph; 5) Frequency graph; 6) Power factor graph

--Data format: all the curves and graphs can be outputted as".doc"format, testing data can be outputted as ".xls" format, and can be printed.

Protection

--Emergency Stop: You can press the Emergency Stop switch in the panel, when the load bank is locked in this state, it cannot add any load.  

--Overvoltage Protection: When input voltage is over the safe value, it can unload automatically and give an alarm.

--Short circuit Protection: When short circuit, fuses in the load bank can insure to unload automatically.

--Overheating Protection: When temperature is over the safe value, it can unload automatically and give an alarm.

--Fan interlock Protection: Load bank cannot add any load when working power of fan is off.

--Protection Buttons: There are buttons for some protection, when misinformation occurs or user has special needs, user can temporarily turn off the corresponding protection function.

--Chassis Ground Protection: In order to avoid the danger of electric shock when operating, the load bank is equipped with special ground protection terminal.

Why choosing us

The earliest and most professional manufacturer of AC/DC Load Bank in China, dedicated to this industry for more than 20 years.
The most patent technology and scientific research awards gainer in China.
Advanced detection method and strict inspection procedure build the qualified quality.
Customized production meet the individual requirement.
Prompt delivery & excellent after sales service.
Cooperate with many well-known enterprise, offer OEM and ODM service to world famous brands.
Certified with China Classification Society (CCS) and ISO9001:2008 Quality Certificate.
Triumph Load is the first brand in the emergency power supply test & maintenance industry in China.
3 Phase AC Rl Integrated Automatic Load Bank
3 Phase AC Rl Integrated Automatic Load Bank
3 Phase AC Rl Integrated Automatic Load Bank
3 Phase AC Rl Integrated Automatic Load Bank

Contact Information

Kaixiang Electrical Technology Co., LTD.
Eric Zhang
ADD:79Wangshan Rd,Luquan District,Shijiazhuang,Hebei,050221,P.R.China
TEL:+86 311 85138355
FAX:+86 311 85138383
M.T.:+86 18937738282
Our service is beyond of products,but the feeling of customers

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier