AC480-1500kW Automatic Load Bank
Introduction
Thank you for using AC380-200KVA-RLC Automatic Load Bank. The system can accurately test output power and load capacity with all kinds of generators,UPS, main electrical parameters including the dynamic parameters test.
Technical Parameters
Technical Parameters |
Rating Voltage/Frequency |
380VAC 50Hz/60Hz,3phase 4 wire |
Load Step |
8 steps;1,2,2,5,10,20,20,40k |
Power Factor |
1 |
Load Tolerance(each step) |
±5% |
Load Tolerance(overall) |
±3% |
Display Precision |
0.5 class |
Control Power Supply |
External 220VAC, 3phase 4wire 50Hz, |
Wire Connection |
Load Power Supply Input--Copper bar (star connection) Control power supply input--Connector bar |
Communication Interface |
RS232 and RS485 |
Insulation Class |
F |
Duty Cycle |
Continuous |
Cooling |
Forced air cooling, horizontal air inlet and air outlet |
Transportation |
Hoisting, there are lifting lug in top of case and wheel castors on the bottom |
Chassis color |
Gray(RAL7035) |
Size |
Approximately; 1600mm×1000mm×1700mm (Width *Length *Height) |
Weight |
Approximately 800kg |
Operating Environment Parameter |
Ambient Temperature |
-10ºC~+50ºC |
Relative Humidity |
≤95% |
Altitude |
≤2500meters |
Atmospheric Pressure |
86~106kPa |
Measuring Control Function
--Load testing: load power that not beyond the rated power, testing and display stable state 3 phases voltage, current, active power, frequency, working time, etc of generator sets.
--Load/unload with one key:Either by manual control or software control, user can preset the power, then press load master button. Load bank loaded according to preset power to avoid load fluctuation during the power changing.
--Control Pattern: user can choose local control and intelligent control.
--Local Control: There is local control panel with several power steps; user can load/unload by button.
--Intelligent Control: Through data processing software in PC, user can make automatic load, to display, record and manage the testing data, to form curves, tables, also to print them.
--Control Pattern interlock:there is control pattern switch, when choose one control pattern, operation of other pattern is invalid, avoid the clash.
--Local meter display data: local meter can display 3 phases voltage, current, active power, frequency and so on.
Software Function
--Communication pattern: Intelligent control use photoelectric isolated RS485 interface connect to PC, with great anti-interference performance to make system control stable. Also user can use USB or RS232 through converter.
--Load pattern: Manual Load or Automatic Load.
--Manual Load: Input power, system will load according to preset power.
--Automatic load: user can preset power and length of working time of several load periods, as per 0%→25%→50%→75%→100% or 110% to make testing.
--Parallel testing: when several load bank work in parallel, user can make parallel testing via software, can display, record parameters of every load bank and whole system parameter of parallel operation.
--Real-time parameter: through software to display real-time voltage, current, power, power factor, frequency and time, etc.
--Security monitoring and control: monitor working state of the load bank by watching software light, when abnormally stop and in protection status, it will show the reason.
--Data collection interval: the minimum storage for interval is 2 seconds.
--Data save and query: all the test data is saved in the software, easy to query in the history testing data.
--Graphical display: show real-time or history testing data, and support to print curve and graph as follows:
1) Graphs of real-time voltage, current, frequency and power; 2) Voltage graph
3) Current graph; 4) Power graph; 5) Frequency graph; 6) Power factor graph
--Data format: all the curves and graphs can be outputted as".doc"format, testing data can be outputted as ".xls" format, and can be printed.
Protection
--Emergency stop: you can press the Emergency Stop switch in the panel, when the load bank is locked in this state, it cannot add any load.
--Overvoltage protection: when input voltage is over the safe value, it can unload automatically and give an alarm.
--Short circuit protection: when short circuit, fuses in the load bank can insure to unload automatically.
--Overheating protection: when temperature is over the safe value, it can unload automatically and give an alarm.
--Fan interlock protection: load bank cannot add any load when working power of fan is off.
--Fan air volume protection: When the air volume of any fan is insufficient, it will automatically unload and alarm.
--Phase sequence protection of fans: 3phase fans still running although there is a wrong phase connect of control power.
--Protection Buttons: There are buttons for some protection, when misinformation occurs or user has special needs, user can temporarily turn off the corresponding protection function.
--Chassis Grounding Protection: to prevent the chassis from being electrified, the load bank equip with a special grounding protection terminal.
Why choosing us
The earliest and most professional manufacturer of AC/DC Load Bank in China, dedicated to this industry for more than 20 years.
The most patent technology and scientific research awards gainer in China.
Advanced detection method and strict inspection procedure build the qualified quality.
Customized production meet the individual requirement.
Prompt delivery & excellent after sales service.
Cooperate with many well-known enterprise, offer OEM and ODM service to world famous brands.
Certified with China Classification Society (CCS) and ISO9001:2008 Quality Certificate.
Triumph Load is the first brand in the emergency power supply test & maintenance industry in China.
Contact Information
Kaixiang Electrical Technology Co., LTD.
Eric Zhang
ADD:33Wangshan Rd,Luquan District,Shijiazhuang,Hebei,050221,P.R.China
TEL:+86 311 85138355
FAX:+86 311 85138383
M.T.:+86 18937738282
Our service is beyond of products,but the feeling of customers