Dual voltage load bank AC440 220-300kW load bank for Generator UPS Testing
1.Product Introduction
()1.Bigger and higher Power Load: parallel running to finish super power testing, and realize much bigger power loading.
2.Accurate Data: with high precision data collection module and measuring meter, related
equipment has passed the many certifications.
3.Control Mode: local panel operation, remote box controlling, and intelligent software.
4.Intelligent Loading: after setting generator rated power in software, system realize
rapid loading through preset proportion, automatically and continuously load multiple
power value and common tests, like stepping, full load, and over load, so that improve
working efficiency.
5.High Efficiency Data Management: display real-time testing data, generate curves graphs automatically,also can export data into excel or word.
6.Protection Function: multiple protection, like over temperature, over voltage,
Short Circuit and Insulation Protection,Fan Interlock protection,Emergency Stop, Alarm protection
2.load bank testing 300kw customed design resistive load bank
Altitute:≤2500m
Temperature:-20°C~50°C
Humidity:≤95%RH
Working Mode:Continuous work(>6hours continuous long-term work per day)
3. AC440 220-300kW load bank for Generator UPS Testing
AC440/220-300kW | |
Rating Voltage/Frequency | 440V AC 3 phase 4wire 60HZ 220V AC 3 phase 4wire 60HZ |
Rated Load Power | 440V AC Resistive load:300kW, 220V AC Resistive load:300kW |
Installed Capacity | Resistive load: 300kW |
Load Step | Select the input voltage by switching the knob. When the input voltage is lower than the rated voltage, the power of the load will change according to Ohm's law. |
PF(Power Factor) | 1 |
Load Tolerance (each step) | ±5% |
Load Tolerance(overall) | ±3% |
Display Precision | 0.5 class |
Fan & Control Power | External AC380V 3phase4wire /60Hz, |
Wire Connection | Load power supply input--Copper bar Control power supply input--Connector-bar |
Insulation | F |
Duty Cycle | Continuous |
Cooling Type | Force air cooling, horizontal air inlet and horizontal air outlet |
Transportation | Hoisting, there are lifting lug on top and a forklift hole with casters at the bottom |
Dimension | About 1820X1300X1070mm(L×W×H) |
Weight | About 500kgs |
Casing Color | Grey(RAL7035)or as required |
Operating Environment Parameter | |
Workplace | outdoor |
Ambient Temperature | -20ºC~+50ºC |
Relative Humidity | ≤95% |
Altitude | ≤2500 meter |
Atmospheric Pressure | 86~106kPa |
4. New Design 400VAC 500KW Resistive Load Bank Overall Appearance
5. More Pictures of AC Load Bank