• Dual Voltage Load Bank AC440 220-300kw Load Bank for Generator UPS Testing
  • Dual Voltage Load Bank AC440 220-300kw Load Bank for Generator UPS Testing
  • Dual Voltage Load Bank AC440 220-300kw Load Bank for Generator UPS Testing
  • Dual Voltage Load Bank AC440 220-300kw Load Bank for Generator UPS Testing
  • Dual Voltage Load Bank AC440 220-300kw Load Bank for Generator UPS Testing
  • Dual Voltage Load Bank AC440 220-300kw Load Bank for Generator UPS Testing

Dual Voltage Load Bank AC440 220-300kw Load Bank for Generator UPS Testing

After-sales Service: Forever
Warranty: 12 Months
Voltage: AC 380V/50Hz, 3 Phase 4 Wire
Max Load Power: 500kw
Power Factor: 1
Load Tolerance(Each Step): ±5%
Customization:
Gold Member Since 2014

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
AC440 220-300kW
Load Tolerance(Overall)
±3%
Display Precision
0.5 Class
Dimension
About 1820X1300X1070mm
Weight
700kg
Insulation Grade
F Class
Cooling
Forced Air Cooling, Horizontal Inlet Air, Upward C
Transport Package
Wooden Case
Specification
AC220 440-300KW
Trademark
Triumph Load
Origin
Hebei, China
HS Code
9030339000
Production Capacity
1000sets/Year

Product Description

Dual voltage load bank AC440 220-300kW load bank for Generator UPS Testing
1.Product Introduction
()1.Bigger and higher Power Load: parallel running  to finish super power testing, and   realize much bigger       power loading.
   2.Accurate Data: with high precision data collection module and measuring meter, related 
  equipment has passed the many certifications.
  3.Control Mode:  local panel operation, remote box controlling, and intelligent software.
  4.Intelligent Loading: after setting generator rated power in software, system realize 
  rapid loading through preset proportion, automatically and continuously load multiple 
  power value and common tests, like stepping, full load, and over load, so that improve 
  working efficiency.
 5.High Efficiency Data Management: display real-time testing data, generate curves graphs   automatically,also can export data into excel   or word. 
  6.Protection Function: multiple protection, like over temperature, over voltage,
  Short Circuit and Insulation Protection,Fan Interlock protection,Emergency Stop, Alarm   protection

2.load bank testing 300kw customed design resistive load bank
Altitute:≤2500m
Temperature:-20°C~50°C
Humidity:≤95%RH
Working Mode:Continuous work(>6hours continuous long-term work per day)

3. AC440 220-300kW load bank for Generator UPS Testing

AC440/220-300kW
Rating Voltage/Frequency 440V AC 3 phase 4wire 60HZ
220V AC 3 phase 4wire 60HZ
Rated Load Power 440V AC Resistive load:300kW,
220V AC Resistive load:300kW
Installed Capacity Resistive load: 300kW
Load Step Select the input voltage by switching the knob. When the input voltage is lower than the rated voltage, the power of the load will change according to Ohm's law.
PF(Power Factor) 1
Load Tolerance  (each step) ±5%
Load Tolerance(overall) ±3%
Display Precision 0.5 class
Fan & Control Power External AC380V 3phase4wire /60Hz,
Wire Connection Load power supply input--Copper bar
Control power supply input--Connector-bar
Insulation F
Duty Cycle Continuous  
Cooling Type Force air cooling, horizontal air inlet and horizontal air outlet
Transportation Hoisting, there are lifting lug on top and a forklift hole with casters at the bottom
Dimension  About 1820X1300X1070mm(L×W×H)
Weight About 500kgs
Casing Color Grey(RAL7035)or as required
Operating Environment Parameter
Workplace outdoor  
Ambient Temperature -20ºC~+50ºC
Relative Humidity ≤95%
Altitude 2500 meter
Atmospheric Pressure 86~106kPa

4. New Design 400VAC 500KW Resistive Load Bank Overall Appearance 
 

Dual Voltage Load Bank AC440 220-300kw Load Bank for Generator UPS Testing
Dual Voltage Load Bank AC440 220-300kw Load Bank for Generator UPS Testing


5. More Pictures of AC Load Bank
Dual Voltage Load Bank AC440 220-300kw Load Bank for Generator UPS Testing

6. Why choosing us

  1. The earliest and most professional manufacturer of AC/DC Load Bank in China, dedicated to this industry for more than 20 years.
  2. The most patent technology and scientific research awards gainer in China.
  3. Advanced detection method and strict inspection procedure build the qualified quality.
  4. Customized production meet the individual requirement.
  5. Prompt delivery & excellent after sales service.
  6. Cooperate with many well-known enterprise, offer OEM and ODM service to world famous brands.
  7. Certified with China Classification Society (CCS) and ISO9001:2008 Quality Certificate.
  8. Triumph Load is the first brand in the emergency power supply test & maintenance industry in China.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now