UPS Testing 1000kw 3 Phase Generator Load Bank Tester Data Center

Product Details
Customization: Available
Conditions
of Use:
Trailer Type, Land Use
Usage: Standby Unit
Gold Member Since 2014

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Years of Export Experience
The export experience of the supplier is more than 10 years
Self-branded
The supplier has 5 Self-brands, check the Audit Report for more information
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (24)
  • UPS Testing 1000kw 3 Phase Generator Load Bank Tester Data Center
  • UPS Testing 1000kw 3 Phase Generator Load Bank Tester Data Center
  • UPS Testing 1000kw 3 Phase Generator Load Bank Tester Data Center
  • UPS Testing 1000kw 3 Phase Generator Load Bank Tester Data Center
  • UPS Testing 1000kw 3 Phase Generator Load Bank Tester Data Center
  • UPS Testing 1000kw 3 Phase Generator Load Bank Tester Data Center
Find Similar Products

Basic Info.

Model NO.
AC400-1000kW
Output Type
AC Three Phase
Cooling
Method
Air Cooled
Installation
Method
Portable
Generator
Type
Diesel Generator
Voltage
AC380V
Frequency
50Hz
Rated Power
1000kw
Insulation Grade
F Class
Transport Package
Wooden Case
Specification
1460 mm*1980mm*1800mm
Trademark
Triumph
Origin
Hebei China
Production Capacity
10/Month

Product Description

1000kW outdoor use load bank for data center ,UPS and generator set testing 

1.Product Introduction
AC380-1000KW Intelligent Generator Testing System,AC Load Bank
It is designed for AC power maintenance,could be used widely in communication base,power supply,power 
station etc.This machine is small,light weight digital table display,easy operation,high intelligence, set the parameters of constant current discharge process can be done automatically.

2.AC380-1000KW Intelligent Generator Testing System,AC Load Bank Working Environment
Altitute:≤2500m
Temperature:-10°C~50°C
Humidity:≤95%RH
Working Mode:Continuous work(>6hours continuous long-term work per day)
 
3.AC380-1000KW Intelligent Generator Testing System,AC Load Bank Technical Specifications

Technical parameter

AC380-1000kW

Rated voltage /Frequency

AC380V/50Hz,3 Phase 3 Wire

Max load power

Resistive load: 1000kW

Load step

Resistive load: 13 steps, 1,2,2,5,10,20,20,50,100,200,200,200,200kW

Power factor

1

Load Tolerance(each step)

±5%

Load Tolerance(overall)

±3%

Display Precision

0.5 class

Control Power Supply

External AC220V/50Hz 

Wire Connection

Load power supply input--Copper bar (star coupling)
Control power supply input--Amphenol connector

Insulation grade

F class

Duty cycle

Continuous

Cooling

Forced air cooling, Horizontal inlet air, Upward cooling

Transportation

Hoisting, there are lifting lug in top of casing and casters in bottom of load bank

Casing Color

Grey(RAL7035)

Dimension

About 1460 mm*1980mm*1800mm(length*width*height)

Weight

About 900kg

Operating Environment Parameter

Ambient Temperature

-10ºC~+50ºC

Relative Humidity

≤95%

Altitude

≤2500 meters

Atmospheric Pressure

86~106kPa

Main components brand

Contactor

 

Circuit Breaker

Siemens

Fuse

Delixi

SCM

Infineon

Alloy Resistor

Kaixiang

Data Management Software

Kaixiang

UPS Testing 1000kw 3 Phase Generator Load Bank Tester Data Center

4.
Quality Inspection
The company has 140 employees, including 50 technicians and 25 senior technicians.It is a research and development team and production team composed of elite professionals. Provide the best technical service for customers
 UPS Testing 1000kw 3 Phase Generator Load Bank Tester Data Center
5.company information

Kaixiang Technology was established in 1994, long-term focus on smart power detection technology development and application in shipbuilding, petroleum, offshore platforms, data centers, communications, power, military, aviation, research institutes and other areas, and in strict accordance with the ISO9001 international quality standard management system for the design, manufacture and service.

The company's core technologies are independent research, has seven patents, 10 software copyrights, two corporate standards.Among them, Kaixiang "smart power marine generators AC load," Science and Technology Department of Hebei Province has been named the international advanced level scientific and technological achievements, the enterprise standard "dry AC load" to upgrade the industry standard by the Ministry of publicity.

UPS Testing 1000kw 3 Phase Generator Load Bank Tester Data Center
6.workshop
UPS Testing 1000kw 3 Phase Generator Load Bank Tester Data Center
7.exhibition
UPS Testing 1000kw 3 Phase Generator Load Bank Tester Data Center

8. Why choosing us

  1. The earliest and most professional manufacturer of AC/DC Load Bank in China, dedicated to this industry for more than 20 years.
  2. The most patent technology and scientific research awards gainer in China.
  3. Advanced detection method and strict inspection procedure build the qualified quality.
  4. Customized production meet the individual requirement.
  5. Prompt delivery & excellent after sales service.
  6. Cooperate with many well-known enterprise, offer OEM and ODM service to world famous brands.
  7. Certified with China Classification Society (CCS) and ISO9001:2008 Quality Certificate.
  8. Triumph Load is the first brand in the emergency power supply test & maintenance industry in China.


 
 
 
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier