11kv Mv Load Bank for Gas Turbine Commissioning

Product Details
Customization: Available
Conditions
of Use:
Land Use
Usage: Common Units
Gold Member Since 2014

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Years of Export Experience
The export experience of the supplier is more than 10 years
Self-branded
The supplier has 5 Self-brands, check the Audit Report for more information
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (24)
  • 11kv Mv Load Bank for Gas Turbine Commissioning
  • 11kv Mv Load Bank for Gas Turbine Commissioning
  • 11kv Mv Load Bank for Gas Turbine Commissioning
  • 11kv Mv Load Bank for Gas Turbine Commissioning
  • 11kv Mv Load Bank for Gas Turbine Commissioning
  • 11kv Mv Load Bank for Gas Turbine Commissioning
Find Similar Products

Basic Info.

Model NO.
AC11-4000KW
Output Type
AC Three Phase
Cooling
Method
Air Cooled
Installation
Method
Fixed
Generator
Type
Steam Turbine Generator
Voltage
11kv
Power
4000kw
Frequency
50Hz,60Hz.
PF
1
Technology
Metal Alloy
Cooling
Air Cooled
Step
500kw
Container
30FT
Productive
OEM, ODM
Transport Package
Container
Specification
ISO
Trademark
Triumph Load
Origin
China
HS Code
903033900
Production Capacity
200 Units

Product Description

Introduction

(1) According to the special requirements of users on site, in the agreement the technical standards of AC11KV-4000kW High Voltage Load Bank (hereinafter referred to as "system") and its accessories are proposed including their function, performance, usage, structure, installation and test to provide users with a high efficient and reliable choice, in order to meet the need for generator load test.

11kv Mv Load Bank for Gas Turbine Commissioning11kv Mv Load Bank for Gas Turbine Commissioning11kv Mv Load Bank for Gas Turbine Commissioning11kv Mv Load Bank for Gas Turbine Commissioning11kv Mv Load Bank for Gas Turbine Commissioning

(2) The system consists of 1 sets of 3000kw load bank. The system is made up of two parts of measurement & control and load, mainly including the high voltage dry type AC load bank, automatic data acquisition system, automatically loading and unloading control system, the cooling device, auxiliary control, remote control box and PC software and so on.

 

(3)This system, which is of independent research and development of electricity load test equipment by our technology, combining high voltage dry type load module with the automatic measurement and control module, with excellent insulation protection performance, itcan directly detect high voltage generator output power and load capacity (no need a step down transformer), full load and overload test.

The system can be used with a computer to realize the intelligent control, automatically completing the special test to all electrical parameters of generating set and generating tables, graphs, and supporting the print, release from the cumbersome manual operation to provide scientific and efficient detection means for the large power high voltage generating sets.

 

(4) All the schematic diagrams of this agreement are for reference only please in kind prevail.  

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier