Customization: | Available |
---|---|
Output Type: | AC Three Phase |
Cooling Method: |
Air Cooled |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Thank you for using our WGP-LB-300kW Smart Load Bank.
This machine is mainly used in State Grid, Research Institute, National Defense, Electricity, Communication, Railway, Instrument, College, etc to test performance and aging of diesel generator sets, on-line high power UPS, inverter, switching power supply. It has several control modes, single unit operation and parallel operation is available. Loading input adopts sectional type to meet the requirement of different loads and power factors.
Technical Parameters |
|
Rating Voltage/Frequency |
3 phase 4 wire, 415/240VAC, 50Hz, |
MAX Resistive |
Resistive:300kW |
Steps |
5 steps: 60,60,60,60,60kW |
PF |
1 |
Load Tolerance(each step) |
±5% |
Load Tolerance(overall) |
±3% |
Display Precision |
0.5 class |
External Power |
Input415/240VAC 3 phase 4 wire 50hz |
Wire Connection |
Load power supply input--Copper bar (star coupling) Control power supply input--connector bar |
Insulation Class |
F class |
Duty Cycle |
Continuous |
Cooling |
Forced air cooling,Horizontal inlet air,Horizontal outlet |
Transportation |
Wooden Case |
Transportation |
With wheel castors at the bottom and lifting lugs on the top |
Dimension |
About the 1540mm*1250mm*1680mm |
Weight |
500kgs |
Operating Environment Parameter |
|
Ambient Temperature |
-10ºC~+50ºC |
Relative Humidity |
≤95% |
Altitude |
≤2500 m |
Atmospheric Pressure |
86~106kPa |
(1)Load Testing: can load any power within the rated power, test the output capacity of the generator set.
(2)Control Mode: Load Bank have been set the load steps. User can be loaded/unloaded by the local control panel or genset controller. Generator will be connected with the load bank through working cables. Once the load bank faults, the genset controller will received the alarm.
(3)Display Data: through this display meter user see the load voltage, Ampere, Power etc data.
(4) Emergency Stop: User can press the Emergency Stop switch in the panel, when the load bank is locked in this state, it cannot add any load.
(5)Over-voltage Protection: when input voltage is over the safe value, it can unload automatically and give an alarm.
(6) Short Circuit Protection: when short circuit, fuses in the load bank can insure to unload automatically.
(7)Overheating Protection: when temperature is over the safe value, it can unload automatically and give an alarm.
(8)Fan Interlock Protection: load bank cannot add any load when working power of fan is off.
(9)Protection Switch: Partial protect function with switch, protection function can be shutdown when misinformation or special requirement.
Why choosing us
The earliest and most professional manufacturer of AC/DC Load Bank in China, dedicated to this industry for more than 20 years.
The most patent technology and scientific research awards gainer in China.
Advanced detection method and strict inspection procedure build the qualified quality.
Customized production meet the individual requirement.
Prompt delivery & excellent after sales service.
Cooperate with many well-known enterprise, offer OEM and ODM service to world famous brands.
Certified with China Classification Society (CCS) and ISO9001:2008 Quality Certificate.
Triumph Load is the first brand in the emergency power supply test & maintenance industry in China.
Contact Information
Kaixiang Electrical Technology Co., LTD.
Eric Zhang
ADD:79Wangshan Rd,Luquan District,Shijiazhuang,Hebei,050221,P.R.China
Our service is beyond of products,but the feeling of customers